Plinth 250mm high. If there is a requirement to install a neutralising system at the boiler installation site, there is plenty of space to do so in the boiler plinth. If installing without plinth use adjustable feet (accessory).
© 2024 Viessmann Direct | Sitemap | Powered by GOb2b
We have placed cookies on your device to help make this website better.